Tuesday, March 1, 2011

I love this process! what do you say?!

original website and post


MOBILITY

Design Development

This week I have been trying to understand the structural system of my proposal in a little more depth. This is slightly tricker than I would have liked, firstly due to the scale of the proposal and secondly due to the form and tesselation. Anyway to make sense of it I started to look at the main roofscape throughout the site and connecting circulation ramps as illustrated below. 

In order to understand the structure of the individual buildings, I need to do more studies into the actual program of each building and determine a layout which works in conjunction with the structural lattice detected on site. To do this I started to look at some of the key spaces in my building:
These perspectives are fairly indicative at this stage but they illustrate the irregularities in the structural system that will be present throughout the building. 

Tracking

The drawings below highlight the process undertaken for generating a structural composition on site, using a camera to carry out the 3d detection. 
The point cloud data from the detection is then fed into processing and is converted into a 3d lattice based on a particle-spring algorithm which connects neighbouring nodes based on their distance.


Programme Strategy

Having analysed the site in a little more detail last week, I have decided to simplify the programme of the proposed development slightly. The drawing below illustrates a quick study of the proposed programme  strategy.

The Augmented-reality Pavilion will be the central exhibition space which will  feature the Archi-maton application along with other application from the Apple App store. The key aim of this space will be to provide public engagement and interaction with the pavilion through the use of mobile technology. 
The AR pavilion also acts as the central plaza connecting the other spaces in the entire master plan. The location of the pavilion is defined through the intersecting point between the main pedestrian routes and key views through the site.


The plan above highlights the location of the key spaces and routes through the site based on the analysis conducted so far. I intend to take this back on site today and start tracking the main spaces in real-time and explore the possible potentials of gestural design.

Site Analysis



Monday, February 28, 2011

Elegant! uh?


 
© Wojtek Gurak
Architects: White arkiteker ab
Location: 
Client: Jarl Asset Management
Project area: 24,600 sqm
Project year: 2005 – 2010
Photographs: Wojtek Gurak
   
© Wojtek Gurak
© Wojtek Gurak
 Waterfront lies adjacent to ’s Central Station. The site has the best public exposure in , with thousands of train passengers passing by every day – its position on the Riddarfjärden bay and its proximity to ’s City Hall also make it an ideal location.
The project consists of three separate buildings with a lower congress and concert section closest to the water, an office building, and a 400-room hotel directly connected to the congress building. However, it was not possible to accommodate the requirement for a 3,000-seat congress hall and a 2,000-seat dining room, within the triangular plot.
plan 01
plan 02
White’s solution was the key to its success. The equation was solved with moveable seating dual-use spaces and a large section of the congress hall suspended beyond the confines of the site, like an enormous canopy over the entrance. Altering the  skyline also required the confidence of the client and the authorities.
© Wojtek Gurak
The upper part of the congress hall will also be spectacular – a free form interacting with movement on the flyovers and quays around the building. The upper seating assemblies seat 1,500 people and allow rapid conversion into two separate halls. The lower section of the hall can add a similar number of visitors in cinema-style seating. Alternatively, the lower seating assemblies can quite simply be retracted to provide space for 2,000 banquet guests.